top of page

Self Builds and Developers

-post-ai-image-8820.png

Build with confidence, avoid costly mistakes

Whether you’re creating your dream home or developing a collection of new properties, having the right inspections in place is essential. Every build must pass seven key stages of inspection by a Registered Building Inspector from Local Authority Building Control. Getting it right first time saves you money, time, and stress.

Pre Inspection Checks

We carry out thorough checks to NHBC requirements and building regulations, ensuring you’re fully prepared for official building control visits.

Key stages we cover:

  1. Foundation

  2. Drainage

    • Insulation (pre‑floor finish)

  3. Sub-structure

    • Brickwork inspections (1st–4th lift)

  4. Super-structure

  5. Roof

  6. Pre-plaster

    • Second fix quality inspection

  7. Final sign‑off inspection

​

Our visits confirm everything required for sign‑off before the inspector arrives.

Extra Inspections 

Keep your build running smoothly, safely, and to the highest standards with optional add‑on checks:

  • Quality inspections after each trade

  • Drylining inspection (pre‑plaster/tape & joint)

  • Second fix inspection

  • Pre‑decoration snagging

  • External landscaping inspection

Contact us for a tailored quote

Call: 07346 142636

bottom of page